Customer: Nanjing Yangzi BASF
Delivery type: core equipment, full technical support
Project Name: digital construction of utility engineering; operation of industrial wireless network.
Project schedule: Several sub-projects are deployed in sequence, and the installation, commissioning and commissioning of the first phase of the project are completed in March 2016; the third phase of the project is closed in November 2017.
Project introduction:The monitoring of regional reliability of compressor in public engineering is the key point of maintenance and management of public engineering. This project uses wireless switch transmitter to connect the level switch of lubricating oil system of compressor unit, realizing the smooth connection of the level work of lubricating oil system to the center without wiring and additional power supply. The central control room and the seamless coverage of the industrial network in the whole area of the compressor room.
The storage system of raw materials and finished products in public engineering is a large number of tank farms. This project provides intelligent wireless pressure gauge to replace old and important field pressure gauges, and solves the following major maintenance hidden dangers: